Sign In | Join Free | My rc363.com
China Shandong Tengfei Hoisting Engineering Co., Ltd. logo
Shandong Tengfei Hoisting Engineering Co., Ltd.
Shandong Tengfei Hoisting Engineering Co., Ltd.
Verified Supplier

1 Years

Home > 300T Crawler Crane >

XGC 300t Crawler Crane Xcmg For Large Projects

Shandong Tengfei Hoisting Engineering Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

XGC 300t Crawler Crane Xcmg For Large Projects

Brand Name : XCMG

Model Number : XGC 300t

Place of Origin : China

MOQ : One Crane

Price : Negotiable Price

Payment Terms : L/C,T/T

Supply Ability : Supply According to Customer Needs

Delivery Time : According to Order Confirmation

Packaging Details : Packing According to Customer Requirements

Max. Lifting Height : 120m

Maximum Lifting Capacity : 300 tons

Maximum Radius : 80 m

Max. Gradeability : 30%

Crawler Length : 10.5 m

Model : XGC300

Boom Length : 18-96m

Maximum Tip Height : 152 m

Counterweight : 100 tons

Max. Line Speed : 120m/min

Fuel Tank Capacity : 1,500 liters

Max. Slewing Speed : 1.5rpm

Contact Now

Crawler Crane 1.5m-4.5m Arm Connection Sections And Main Boom Assembly For 300t Max Rated Lifting Capacity.

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

Shield working conditions

A. Shield working conditions_main boom section combination table

Name and quantity Main boom assembly

Main boom bottom section 10.5m

Main boom middle section 3m

Main boom middle section 6m

Main boom middle section 12mA

Main boom tapered section 7m

Main arm connection section 1.5

Boom pulley block

HB19

1

0

0

0

1

1

1

HB22

1

1

0

0

1

1

1

HB25

1

2[0]

0[1]

0

1

1

1

HB28

1

3[1]

0[1]

0

1

1

1

HB31

1

2[0]

1[0]

0[1]

1

1

1

Notes:

1.The rear pull plates of the tower arm need to be removed from each boom section, and the guide pulleys for the tower arm need to be removed from the main boom reducer section.

2.Two main boom intermediate sections 3m can be used to replace one main boom intermediate section 6m, or two main boom intermediate sections 3m and one main boom intermediate section 6m can be used to replace one main boom intermediate section 12mA. When replacing, attention must be paid to the matching of the number of pull plates and pins.

B. Shield working conditions_Shield auxiliary arm section combination table

Name and quantity
Shield arm assembly

Shield arm bottom section4.5m

Shield arm middle section 3m

Shield arm middle section 6m

Shield arm top section 2.5m

Shield arm single pulley

F(S) 7

1

0

0

1

(1)

F(S)10

1

1

0

1

(1)

Notes:

1. (S) ---- indicates the optional single pulley of the shield jib [single pulley of the shield arm and single pulley of the fixed jib].

2. The shield jib section is common to the fixed jib section.

3. To ensure the maximum function of the arm combination, it is recommended that users choose to purchase the shield jib length of 7m.

C. Shield working condition arm table

Turntable counterweight 115t + vehicle body counterweight 40t

Main boom length

Shield arm length

HB19

HB22

HB25

HB28

HB31

F(S) 7

F(S)10

Notes:

1. “●” - The boom can be raised.

2. The rear pull plates of the tower arm need to be removed from each boom section, and the guide pulleys for installing the tower arm need to be removed from the main boom reducer.

3. A 260t hook is recommended for the main boom and a 160t hook is recommended for the shield auxiliary boom.

4. When raising the boom, please place the crawler drive wheel behind the vehicle body.


Product Tags:

300t crawler crane xcmg

      

large projects crawler crane xcmg

      
China XGC 300t Crawler Crane Xcmg For Large Projects wholesale

XGC 300t Crawler Crane Xcmg For Large Projects Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shandong Tengfei Hoisting Engineering Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0